Meetings and congresses

Switzerland Convention & Incentive Bureau

New openings and investments

Nendaz Hotel

Nendaz Hotel

Lugano

Lugano

Share contents

Thanks for your rating

New openings

Arosa

Valsana, ArosaDescription: Complete renovation. The hotel remains closed for 30 months (from April 2015) / Infrastructure: 40 rooms, 9 serviced Apartments, 10 holiday flats. Wellness area. Restaurant with big terrace / Opening: Autumn 2017

Bern-Bernese Oberland

Grand Hotel Regina*****, GrindelwaldDescription: total renovation / Infrastructure: 130 rooms, 56 luxury apartments, 1600m2 Spa area / Investment: CHF 100 Mio / Opening: 2017

Engadin St. Moritz

Grace Hotel Description: former Hotel Margna, complete renovation, new luxury hotel / Infrastructure: 36 rooms and suites and several serviced apartments / Opening: December 2017

Geneva

Four Seasons Hôtel des Bergues*****Description: renovation of 21 rooms plus 18 new rooms, among them 3 presidential suites / Infrastructure: total capacity: 115 rooms

Hotel BristolDescription: Conference rooms closed for renovation from september 2015 until May 2016 / Infrastructure: 100 rooms, plus 9 new rooms, 1 conference room for 60 persons (from May 2016) / Re-opening conference room: May 2016

Lake Geneva Region

Grand Hotel Yverdon-les-BainsDescription: extensive renovation of the Grand Hotel and of the thermal bath / Infrastructure: 115 rooms / Investment: CHF 23 Mio / Duration of the renovation works: 2016-2021

Gstaad

Hotel Steigenberger Alpenhotel and Spa becomes HUUSDescription: The hotel will be closed from the end of March until the beginning of december 2016. New concept with many included additional services / Infrastructure: 136 rooms / Opening: beginning of december 2016

Lausanne

Hotel Royal Savoy*****, The Bürgenstock SelectionDescription: complete renovation / Infrastructure: 196 rooms, 10 meeting rooms including a ball room (574m2) / Opening: April 2016

Beaulieu Lausanne Convention & Exhibition CentreDescription: renovation and extension works until 2020; including hotels; next to Beaulieu Convention & Exhibition Centre / Infrastructure: 33 meetings rooms / Investment: CHF 100 Mio from public fonds / Opening: 2020

Lucerne & Central Switzerland

Resort BürgenstockDescription: complete renovation / Infrastructure: 4 hotels (Waldhotel, Bürgenstock Hotel, Palace Hotel, Taverne 1879) with a total of 382 rooms, 60 residential suites. 2200m2 meeting space, with a total capacity for up to 900 persons / Investment: CHF 500 Mio / Opening: summer 2017

Hotel Restaurant Stoos HüttäDescription: The hotel is newly built and will be open from this winter in winter and summer. Attractive mountain hotel / Infrastructure: 10 rooms for up to 45 guests (rooms from 2 to 7 persons) / Opening: Winter 2015/2016

Hotel am KurparkDescription: 5-star hotel, extension of the existing 110-year old Hotel Europäischer Hof in the centre of Engelberg / Infrastructure: 100 rooms / Opening: tbd, start of works: April 2016

Montreux

Montreux Music & Convention CentreDescription: modernization of the facilities / work should start in September 2018 / Investment: CHF 50 Mio

Zürich

Kongresshaus ZürichDescription: Modernisation, renovation and extension of infrastructure of existing Kongresshaus / Investment: CHF 240 Mio / Closing: August 2017, opening: August 2020

Hotel Riverside with Riverlodge, Glattfelden, ZürichDescription: Extension "Riverlodge" / Infrastructure: hotel rooms at Riverside: 44, new at Riverlodge: plus 55 rooms; 14 seminar rooms with a total capacity of 350 persons / Opening: 1 April 2016

Lake SideDescription: from Winter 2016/2017 extensive renovations (conference facilities, restaurantion, kitchen and terrace) / Capacity: up to 1000 persons, with mobile extension up to 1500 persons / Re-opening: May 2017

The Züri****, by FassbindDescription: The Hotel Senator is now closed for total reconstruction and will reopen under a new name / Infrastructure: 167 rooms / Opening: 2017

Expansions and reopenings

Arosa

Valsana, ArosaDescription: Complete renovation. The hotel remains closed for 30 months (from April 2015) / Infrastructure: 40 rooms, 9 serviced Apartments, 10 holiday flats. Wellness area. Restaurant with big terrace / Opening: Autumn 2017

Bern-Bernese Oberland

Grand Hotel Regina*****, GrindelwaldDescription: total renovation / Infrastructure: 130 rooms, 56 luxury apartments, 1600m2 Spa area / Investment: CHF 100 Mio / Opening: 2017

Engadin St. Moritz

Grace Hotel Description: former Hotel Margna, complete renovation, new luxury hotel / Infrastructure: 36 rooms and suites and several serviced apartments / Opening: December 2017

Geneva

Four Seasons Hôtel des Bergues*****Description: renovation of 21 rooms plus 18 new rooms, among them 3 presidential suites / Infrastructure: total capacity: 115 rooms

Hotel BristolDescription: Conference rooms closed for renovation from september 2015 until May 2016 / Infrastructure: 100 rooms, plus 9 new rooms, 1 conference room for 60 persons (from May 2016) / Re-opening conference room: May 2016

Lake Geneva Region

Grand Hotel Yverdon-les-BainsDescription: extensive renovation of the Grand Hotel and of the thermal bath / Infrastructure: 115 rooms / Investment: CHF 23 Mio / Duration of the renovation works: 2016-2021

Gstaad

Hotel Steigenberger Alpenhotel and Spa becomes HUUSDescription: The hotel will be closed from the end of March until the beginning of december 2016. New concept with many included additional services / Infrastructure: 136 rooms / Opening: beginning of december 2016

Lausanne

Hotel Royal Savoy*****, The Bürgenstock SelectionDescription: complete renovation / Infrastructure: 196 rooms, 10 meeting rooms including a ball room (574m2) / Opening: April 2016

Beaulieu Lausanne Convention & Exhibition CentreDescription: renovation and extension works until 2020; including hotels; next to Beaulieu Convention & Exhibition Centre / Infrastructure: 33 meetings rooms / Investment: CHF 100 Mio from public fonds / Opening: 2020

Lucerne & Central Switzerland

Resort BürgenstockDescription: complete renovation / Infrastructure: 4 hotels (Waldhotel, Bürgenstock Hotel, Palace Hotel, Taverne 1879) with a total of 382 rooms, 60 residential suites. 2200m2 meeting space, with a total capacity for up to 900 persons / Investment: CHF 500 Mio / Opening: summer 2017

Hotel Restaurant Stoos HüttäDescription: The hotel is newly built and will be open from this winter in winter and summer. Attractive mountain hotel / Infrastructure: 10 rooms for up to 45 guests (rooms from 2 to 7 persons) / Opening: Winter 2015/2016

Hotel am KurparkDescription: 5-star hotel, extension of the existing 110-year old Hotel Europäischer Hof in the centre of Engelberg / Infrastructure: 100 rooms / Opening: tbd, start of works: April 2016

Montreux

Montreux Music & Convention CentreDescription: modernization of the facilities / work should start in September 2018 / Investment: CHF 50 Mio

Zürich

Kongresshaus ZürichDescription: Modernisation, renovation and extension of infrastructure of existing Kongresshaus / Investment: CHF 240 Mio / Closing: August 2017, opening: August 2020

Hotel Riverside with Riverlodge, Glattfelden, ZürichDescription: Extension "Riverlodge" / Infrastructure: hotel rooms at Riverside: 44, new at Riverlodge: plus 55 rooms; 14 seminar rooms with a total capacity of 350 persons / Opening: 1 April 2016

Lake SideDescription: from Winter 2016/2017 extensive renovations (conference facilities, restaurantion, kitchen and terrace) / Capacity: up to 1000 persons, with mobile extension up to 1500 persons / Re-opening: May 2017

The Züri****, by FassbindDescription: The Hotel Senator is now closed for total reconstruction and will reopen under a new name / Infrastructure: 167 rooms / Opening: 2017

New openings

Bern Bernese Oberland

Hotel Reuti HaslibergDescription: 3* hotel with restaurant for 120 persons, dividable in 2 rooms / Infrastructure: 14 double rooms and 4 suites (totally 40 beds) / Opening: December 2015

Davos

Ameron Mountain Hotel DavosDescription: New hotel, opposite of the Congress Center Davos / Infrastructure: 148 rooms and suites; 6 conference rooms for up to 175 persons / Opening: 1st December 2015

Engadin St. Moritz

The Bever Lodge, BeverDescription: first wooden modular hotel in Switzerland / Opening: 13 December 2015

Lake Geneva Region

Base Nyon, NyonDescription: Suite hotel in the heart of Nyon / Infrastructure: 52 suites / Opening: October 2015

Interlaken & Thun

Hotel Schützen***, SteffisburgDescription: extension of the restaurant Schützen / Infrastructure: 45 double rooms, meeting facilities for 120 persons / restaurant with terrace / Opening: 1 November 2015

Lugano

The View, LuganoDescription: Luxury hotel. The interiour resembles a yacht / Infrastructure: 16 junior suites (of 55m2) each with a balcony of 17m2, 2 grand suites (100m2 each) with a balcony of 35m2. 1 gourmet restaurant with 50 seats, a lounge/bar for 40 persons and a 600m2 terrace. Indoor Pool and Spa also available. One seminar room for up to 75 persons, divisable in two rooms, equipped with the most modern technique / Opening 1. September 2015 (Soft Opening: 15. June 2015)

St. Gallen & Eastern Switzerland

Hotel Schwägalp, SäntisDescription: hotel with 68 rooms, flexible seminar and banquet room, new cable car station, shop, restaurants / Investment: CHF 42 Mio / Opening: mid-December 2015

Ticino

CAST - Event Arena, Castione- ArbedoDescription: new congress centre / Infrastructure: conference room for up to 540 persons (1525m2) / Investment: CHF 50 Mio / Opening: Autumn 2015

Valais

Martigny Boutique HotelDescription: the hotel was built in cooperation with the Fondation Pierre Gianadda. It employs 30 persons with a handicap / Infrastructure: 52 rooms and suites / Opening: 1st October 2015

The Capra, Saas-FeeDescription: understated luxury and comfort with a contemporary twist on traditional Swiss chalet style / Infrastructure: 14 suites / Opening: 18 December 2015

Zürich

Kameha Grand Hotel ZürichDescription: international lifestyle hotel; start of construction november 2012 / Infrastructure: 245 rooms and suites, conference facilities up to 960 persons / Opening: 28 February 2015

Hotel Atlantis by GiardinoDescription: 5* superior Hotel / Infrastructure: 95 rooms, event facilities for up to 220 guests, indoor- & outdoor pool, dipiù Spa / Investment: CHF 60 Mio / Opening: 1st December 2015

Marktgasse HotelDescription: very centrally located boutique hotel / Infrastructure: 39 rooms, library and salon for 14 seminar participants each / Opening: 2015

Expansions and reopenings

Ascona

Hotel Eden Roc, AsconaDescription: 30 completely renovated rooms / Infrastructure: total 95 rooms / Opening: June 2015

Basel

East West Hotel***Description: The 3-star city hotel lies at the Rhine and has a splendid view over the old town of Basel / Infrastructure: 44 rooms / Opening: June 2015

Crans-Montana

Hotel Aïda CastelDescription: total renovation. Hotel remains closed for 1 year from April 2014 / Re-opening: Spring 2015

Geneva

CERN: Globe of Science and InnovationDescription: Renovation from April 1st 2014 / Reopening: end of 2015

Four Seasons Hôtel des Bergues*****Description: renovation of 21 rooms plus 18 new rooms, among them 3 presidential suites / Infrastructure: total capacity: 115 rooms

Lake Geneva Region

Hotel de RougemontDescription: total renovation / Infrastructure: 12 rooms and 21 suites / Opening: Winter 2014/2015

Graubünden

The Alpina Mountain Resort & Spa****, TschiertschenDescription: Renovation of the hotel / Infrastructure: 20 rooms and 26 beds in family suites; little seminar area and attractif spa / Opening: 19 December 2015

Interlaken & Thun

Hotel Restaurant Holiday ThunDescription: Renovation of all rooms during winter 2014/2015 / Opening: Spring 2015

Lugano & Ticino

LAC Lugano Arte e CulturaDescription: new building designed by the Ticino architect Ivano Gianola / Infrastructure: large stage and Concert Hall of exhibition spaces dedicated to the permanent collection and temporary exhibitions, a theater-studio and multi-purpose room; the large square in front is designed for outdoor performances and events; it will host new art museum with 2360m2 / Investment: CHF 170 Mio / Opening: 2015

Lucerne & Central Switzerland

Hotel MelchseeDescription: Former Hotel Reinhard. Complete renovation / Infrastructure: 35 rooms and 43 apartments / Investment: CHF 52 Mio / Opening: winter 2014/2015

Hotel Restaurant Stoos HüttäDescription: The hotel is newly built and will be open from this winter in winter and summer. Attractive mountain hotel / Infrastructure: 10 rooms for up to 45 guests (rooms from 2 to 7 persons) / Opening: Winter 2015/2016

Montreux

Montreux Music & Convention CentreDescription: technical modernization of the technical equipment of the 2m2c on the occasion of its 40 anniversary; work started in december 2012 / Investment: CHF 7.7 Mio

Valais

Hotel National Resort & SpaDescription: total renovation of one of Champery's best-known historic hotels. Resort's first four-star hotel / Infrasctructure: 9 rooms and 7 suites. Meeting room accommodating 10 to 20 people, attractive spa area / Opening: Autumn 2015

Zürich

EMA House Hotel SuitesDescription: first class hotel suites and service apartments / Infrastructure: 23 modern suites, all equipped with exclusive materials and special selected furniture. 3 meeting rooms and a multifunctional room with a capacity for up to 60 persons / Opening: open, 2015

Marktgasse Hotel ZürichDescription: Boutique hotel, 4* standard, centrally located / Infrastructure: 39 rooms / Opening: 1 November 2015

New openings

Basel

Novotel****Description: 4* hotel close to the main station of Basel, station Grosspeter / Infrastructure: 145 rooms, conference rooms: 203m2 and 2x45m2 / Opening: 1 September 2014

The Passage****Description: design-hotel / Infrastructure: 52 rooms, one suite and 3 lofts, conference facilities / Opening: March 2014

IBIS Budget Basel*Description: In the same building as the new Novotel**** / Infrastructure: 194 rooms / Opening: September 2014

Bern

Gurten – Park in the GreenDescription: the Gurten provides the ideal surroundings to combine business and pleasure for group activities. Thanks to the Gurten's idyllic natural setting, including a world class view of Bern and the Alps / Capacity: 500 persons / Opening: June 2014

SBB Business PointDescription: at the station in Bern / Infrastructure: 16 meeting rooms with daylight, for 4-40 persons, 14 single work places / Opening: beginning 2014

Geneva

Lake Geneva Hotel***, VersoixDescription: belongs to the Boas group / Infrastructure: 100 rooms, seminar rooms / Opening: March 2014

Gstaad

Youth hostelInfrastructure: 158 beds/42 rooms / Investment: CHF 10.1 Mio / Opening: July 2014

Lausanne

SwissTech Convention CenterDescription: congress centre on the EPFL Campus / Infrastructure: capacity of 3000 persons, 17 flexible meeting rooms / Investment: CHF 225 Mio / Opening: April 2014

Discovery Hotel*** CrissierDescription: belongs to the Boas Group / Infrastructure: 98 rooms, 3 seminar rooms / Opening: 1 April 2014

Lucerne & Central Switzerland

Caschu Alp Boutique Design Hotel, StoosDescription: New hotel on the Stoos. Seminar room of 60m2 for smaller groups / Infrastructure: 9 rooms / Opening: December 2014

St. Gallen & Eastern Switzerland

Congress hotel arcona LIVING SCHAFFHAUSEN****, Description: The hotel is air-conditioned, Minergie standard, 6 floors, W-LAN throughout the hotel / Infrastructur: 112 double rooms and 18 apartments (can be booked as suites) / Infrastructure: 5 events rooms, 2 board rooms on a total surface of 500m2 - for upt to 340 delegates. Modern interieur, state-of-the-art technique, day light, flexible and dividable rooms. Restaurant with show kitchen for up to 100 persons. Sun-terrace for up to 40 delegates. Bar-lounge for up to 60 delegates. Underground garage with direct hotel access. asia spa on a surface of 1200m2 / Opening: 1 October 2014

Valais

Mer de Glace****, NendazDescription: hotel, wellness centre and 7 chalets / Infrastructure: 170 hotel rooms and 380 beds in 7 chalets / Investment: CHF 128 Mio / Opening: 2014

WellnessHostel4000, Saas-FeeDescription: at the entrance to Saas-Fee village, right next to the postbus stop, 51 rooms (double, four-bed, family rooms and sid-bed rooms) / Opening: 5 September 2014

Reka Holiday Village Blatten-BelalpDescription: new family equipped holiday resort / Infrastructur: 50 apartments / Investment: CHF 28 Mio / Opening: Christmas 2014

Boutique Hotel The Capra, Saas-Fee Description: understated luxury and comfort with a contemporary twist on traditional Swiss chalet style / Infrastructure: 14 suites / Opening: 20 december 2014

Zürich

Sheraton**** Zürich Hotel, Hard Turm Park Zürich WestInfrastructure: 197 rooms, 7 modern conference rooms, 1 board room, 1 ball room for 240 persons / Opening: January 2014

Dorint Airporthotel Zürich****Infrastructure: 235 rooms, 2 conference and 2 meeting rooms, 1 ball room / Opening: 5 March 2014

Ibis Budget-Hotel***Infrastructure: 240 rooms / Opening: 2014

Expansions and reopenings

Basel

Pullmann Basel EuropeDescription: former Mercure Hotel Europe Basel / Infrastructure: 141 rooms, 6 bright meeting rooms for events up to 200 persons (total of 500m2) / Opening: 1 March 2014

Bern

Hotel Belle Epoque****Description: renovated boutique hotel / Infrastructure: 17 rooms / Opening: beginning 2014

Hotel Ambassador & SPA****Description: renovated and modern seminar infrastructures, für meetings and banquets for up to 200 persons / Infrastructure: 97 hotel rooms and 5 junior suites / Opening: May 2014

Valais

Hotel Crans Ambassador*****, Crans-MontanaDescription: new concept "luxury sport resort"; Complete renovation / Infrastructure: 85 rooms, suites and apartments, 3 restaurants, spa on 1300m2 / Opening: 13 June 2014

Davos

Hotel Flüela DavosDescription: complete renovation / Infrastructure: 70 rooms, conference infrastructure / Re-opening: winter 2013/2014

Lake Geneva Region

Hotel de RougemontDescription: total renovation / Infrastructure: 12 rooms and 21 suites / Opening: Winter 2014/2015

Lucerne & Central Switzerland

Hotel Schweizerhof Luzern****Description: 52 guest rooms renovated. Renovation of the remaining 49 rooms from January-April 2014 / Infrastructure: 101 hotel rooms and suites, 9 conference rooms / Opening: 1st part: Spring 2013, 2nd part: Spring 2014

Château Gütsch, Lucerne****Description: 27 renovated rooms and suites / Infrastructure: 27 rooms and suites, several seminar rooms for up to 60 persons / Opening summer 2014

St. Gallen & Eastern Switzerland

Hotel Säntispark in AbtwilDescription: new rooms (now 70), a second restaurant and seminar infrastructure; 6 months construction time / Infrastructure: 136 rooms after renovation; seminar room with total surface of 380m2; 2 restaurants in total / Investment: CHF 40 Mio / Re-opening: middle of 2014

New openings

Basel

Second Hotel of the Krafft GroupDescription: 4-star-city hotel, innovative gastronomical concept / Infrastructure: 65 rooms / Opening: end of 2015

Novotel****Description: 4* hotel close to the main station of Basel, station Grosspeter / Infrastructure: 145 rooms, conference rooms: 203m2 and 2x45m2 / Opening: September 2014

The Passage****Description: design-hotel / Infrastructure: 52 rooms, one suite and 3 lofts, conference facilities / Opening: March 2014

Mövenpick Hotel*****Description: Project "Baloise - Aeschengraben Replacement Buildings", incl office space, shops and a new business Hotel. Contract should be signed by January 2014, followed by the start of the project. Opening: 2017

IBIS Budget Basel*Description: In the same building as the new Novotel**** / Opening: September 2014

Motel One*Description: the new hotel project promises chic design, valuable materials at affordable prices / Infrastructure: 136 rooms / Investment: CHF 17 Mio / Opening: 2016

Davos

InterContinental Resort & Spa***** UFO DesignInfrastructure: 216 rooms & suites and 37 apartments / Investment: CHF 155 Mio / Opening: 2013

Graubünden

PRIVA Alpine Lodge, LenzerheideDescription: extraordinary chaletresort with village character / Infrastructure: 96 apartments and chalets / Investment: CHF 75 Mio / Opening: winter 2013

Lucerne & Central Switzerland

Andermatt Swiss AlpsDescription: 6 Hotels in the 4* and 5* sector / Infrastructure: total 844 hotel rooms; congress and concert facilities for up to 600 people / Investment: CHF 1.8 Mia (incl apartments, villas, commercial space, sports and leisure centre, golf course, parking spaces,...) / Opening: first hotel "The Chedi" on 6 December 2013. Radisson Blu Hotel in Andermatt (240 rooms): winter 2017/2018

New motorboat, MS2017Description: motorboat / infrastructrue: space for 1000 passenger, on 1400 m2, inside area for 400 persons / Investment: CHF 14 Mio / Start of operation: Spring 2017

St. Gallen & Eastern Switzerland

Würth Haus Rorschach Conference CentreDescription: Carmen Würth Hall and 12 other conference rooms, space for events of all types / Opening: 2013

Hotel Eastside*** St. GallenDescription: business hotel / Opening: September 2013

Ticino

Hotel auf dem Monte GenerosoDescription: New hotel with restaurant on top of Monte Generoso. Architect: Mario Botta / Infrastructur: 10 double rooms. 2 conference rooms (biggest with capacity for up to 100 persons), one exhibition room, terrace for up to 400 persons / Opening: 2016

Valais

W Verbier*****Infrastructure: 123 rooms and suites, 2 meeting rooms / Investment: CHF 160 Mio / Opening: december 2013

Hôtel des Bains****, SaillonInfrastructure: 150 rooms, 3 meetings rooms / Opening: to be confirmed

Hôtel Nendaz 4 Vallées, NendazDescription: 4* hotel & spa / Infrastructure: 62 rooms and 13 apartments, 2 modulable conference rooms for up to 200 persons / Investment: CHF 128 Mio / Opening: 5 December 2013

Le White, ChampéryDescription: new 4* hotel with wellness area / Infrastructur: 27 rooms / Opening: tbc

Zürich

Aura Event LocationDescription: event location in the heart of Zürich (Paradeplatz) / Infrastructure: multifunctional room for up to 500 delegates, depending on the event / Opening: January 2013

320 WEST - the new event locationDescription: in Zürich-West, unique concept, that combines events, art, and culinary art / Infrastructure: Modern technical equipment, 320m2 ideal for meetings, presentations, weddings, business events, foto and film shootings and aperos. With show kitchen / Opening: January 2013

Holiday Inn Express***, Affoltern am AlbisInfrastructure: 102 rooms, 3 connectible meeting rooms of 20m2 each, total capacity 40 persons / Opening: October 2013

Expansions and reopenings

Basel

Basel Exhibition Centre 2012Description: at the heart of the project, which has been designed by the famous architects Herzog & de Meuron of Basel, is the extension of Hall 1 into the Exhibition Square, the renovation of the Hall 3, situated near the multi-storey car park and the construction of a two-storey superstructure which will cover the Exhibition Square and connect both the halls / Infrastructure: 11 new modular group meeting rooms (total of 25 rooms) / Investment: CHF 430 Mio / Opening: during Baselworld 2013

Bern

Schloss HünigenDescription: renovated Hallersaal / Infrastructure: Hallersaal and 9 additional rooms with a capacity of up to 250 persons, 27 castle rooms and 22 rooms in the garden pavilion / Opening: 2013

Davos

Steigenberger Bélvèdere***** DavosDescription: total renovation / Infrastructure: 97 rooms and 30 suites; 5 conference rooms with modern technique / Investment: CHF 6 Mio / Opening: November 2013

Hotel Flüela DavosDescription: complete renovation / Infrastructure: 70 rooms, conference infrastructure / Re-opening: winter 2013/2014

Geneva

Crowne Plaza GenevaDescription: two extra floors with 60 new, bigger Club Rooms and a private function room; all rooms will be given a makeover; they'll have a new look and be even more comfortable; the public areas will be redesigned in stunning style / Infrastructure: total 368 rooms / Opening: 2013

Interlaken

Bond World 007 & new viewing platform "Piz Gloria View"Bond World 007 & new viewing platform "Piz Gloria View" / Investment: CHF 1 Mio / Opening: summer 2013

Lausanne

The Olympic MuseumDescription: complete renovation; closing in the beginning of 2012 / Investment: CHF 50 Mio / Reopening: 21 December 2013

Lugano & Ticino

La Claustra**** - hotel in the rock, AiroloDescription: soft renovation, opening of Leventina seminar room. Lies at over 2,050 m.a.s.l. in the midst of the Swiss Alps in the heart of St. Gotthard region / Infrastructure: 17 rooms (30 beds); seminar rooms for groups from 20-30 people / Investment CHF 0.5 Mio / Re-opening: 1st May 2013

Lucerne & Central Switzerland

KKL LuzernDescription: renewels / Investment: CHF 13 Mio / Opening: 2013

Messe LucerneDescription: 15'000m2 covered exhibition space; new railway stop with direct connection from Lucerne train station / Opening: complete renovation by summer 2013

Motorboat MS SchwyzDescription: motorboat, built in 1958; after facelifting ideal for events / Infrastructure: capacity up to 200 persons for banquets / Investment: CHF 2.7 Mio

Campus Hotel HertensteinDescription: Re-opening after 3 years of renovation / Infrastructure: 59 double rooms and junior suiten. 12 seminar rooms / Opening: Summer 2013

Campus SurseeDescription: 144 new hotel rooms / Infrastructure: 350 rooms during the week and 550 rooms during weekends. Conference room for up to 500 people and 57 break-out rooms / Opening: September 2013

Montreux

Montreux Music & Convention CentreDescription: technical modernization of the technical equipment of the 2m2c on the occasion of its 40 anniversary; work started in december 2012 / Investment: CHF 7.7 Mio

St. Gallen & Eastern Switzerland

Olma Messen St.GallenDescription: Four new seminar rooms for smaller events, 30-200 persons each, combinable / Opening: August 2013

Zürich

Bellerive au LacDescription: already renovated, but re-investing CHF 300'000.- / Opening: 2013

Trafo in BadenDescription: Former industrial building. For all kind of events. Expansion of the rooms- Three new event rooms are to be built in Hall 36, while Hall 38 is being transformed into a hotel with 80 guest rooms and eight small to medium-sized seminar room / Opening: 2013

Thessoni classic & homeDescription: former Trend Hotel Zürich Regensdorf. 1st renovation phase: lobby, conference rooms and restaurants / Infrastructure: 49 rooms. Several conference rooms / Opening: end of 1st renovation phase: September 2013

New openings

Davos

Hilton Garden Inn**** Description: 1. Hilton Garden Inn in Switzerland, opposite the extended congress centre / Infrastructure: 148 rooms, 5 meeting rooms, wellness area / Investment: CHF 50 Mio / Opening: 13 November 2012
morosani fiftyoneDescription: room only hotel; in the centre of Davos, opposite the Morosani Posthotel / Infrastructure: 24 double rooms / Opening: 2011 Hotel Grischa****+Description: former Hotel Terminus***; complete renovation and creation of 93 rooms and suites, 5 restaurants, and conference facilities (over 400 m2) / Opening: december 2010

Delémont, Jura

Ibis DelémontInfrastructure: 80 rooms / Opening: February 2011

Engadin St. Moritz

Giardino Mountain*****, Champfèr - St.MoritzInfrastructure: 78 rooms & suites, 3 restaurants, 2 seminar rooms, Spa with extraordinary architecture / Opening: mid december 2011

Flims Laax Falera

Event Centre in FlimsDescription: new event centre in the former riding hall, 400m2 / Opening: 2011
Waldhaus Arena in FlimsDescription: hall up to 2000 pax at the Waldhaus Flims / Opening: october 2009

Geneva

Uptown GenevaDescription: in the city centre of Geneva / Infrastructure: 3 rooms and a lounge of 2400 m2

Graubünden

Bestzeit Hotel & Sport, ParpanDescription: sport- and rental shops integrated in the hotel, ski ticket included in room rate, rental skis can be booked when booking the room / Infrastructure: 26 rooms, 6 suites, 4 family suites (one suite has 2 connected rooms); 1 restaurant, wellness area; fitness room can be used as meeting room / Opening: december 2012
Waldhotel National****, ArosaDescription: extension to the existing Waldhotel (83 rooms) / Infrastructure: 33 new rooms and 12 new suites, new plenary room for 150 persons / Investment: CHF 16 Mio / Opening: december 2010

Gstaad

The Alpina Gstaad*****Infrastructure: Hotel with 57 rooms and suites, 11 private apartments and 3 chalets, first "Six Senses Spa" in Europe / Investment: CHF 300 Mio / Opening: december 2012

Hamilton Lodge & Spa***, ZweisimmenDescription: sister hotel on the Belalp, Valais / Infrastructure: 24 rooms / Investment: CHF 5 Mio / Opening: december 2012

Lausanne

Swiss event locations in Belmont-sur-LausanneDescription: new conference, congress and event location; the former art museum has a total of 4 rooms and a big terrace, with a capacity of 300 persons, ideal for aperos in summer; with kitchen and bar /
Infrastructure: total capacity: 1500 persons; exhibition hall: 850 delegates, conference hall: 350 delegates, column hall: 500 delegates, foyer: 300 delegates / Opening: 2012

Hotel Lavaux, CullyDescription: complete renovation of the former motel, that was built in 1964 / Infrastructure: 58 rooms and 6 apartments, cave of 140m2 for events; 2 small conference rooms / Opening: 1 july 2012 L HOTELDescription: located right in the centre of Lausanne, in the Flon area / Infrastructure: 26 rooms / Opening: november 2011

Etap Hotel Lausanne BussignyInfrastructure: 116 rooms / Opening: may 2011 Rolex Learning CentreDescription: at the EPFL Site / Infrastructure: capacity for 600 pax / Opening: february 2010
Starling Hotel****Infrastructure: 154 rooms / Opening: spring 2010

Lugano

Design-Hotel Gabbani, LuganoInfrastructure: 14 rooms; seminar room for 30-40 persons / Opening: march 2012

Novotel****, Ibis Hotel and Ibis Budget Hotel, Lugano ParadisoInfrastructure: 249 rooms (Novotel: 96 rooms, Ibis Hotel: 70 rooms, Ibis Budget Hotel: 83 rooms); 3 conference rooms for up to 135 persons / Investment: CHF 53 Mio / Opening: july 2012

Lucerne and Central Switzerland

CabriO cable car to Mt StanserhornnDescription: double-decker cable car with 2 cabins and open upper deck / Infrastructure: capacity lower deck: 60 persons, capacity upper deck: 30 persons / Investment: CHF Mio 28.1 / Opening: 29 june 2012

Rigi Wellness World, Rigi KaltbadDescription: mineral bath and Spa "Giardino Minerale", designed by star-architect Mario Botta / Opening: 1 July 2012
swissporarenaDescription: football stade of the Lucerne football club; top modern and multi functional business lounge, banquets for up to 570 persons / Opening: end of july 2011

Frutt Lodge & Spa****, Melchsee-FruttInfrastructure: 150m2 seminar room, plus 275 m2 roof terrace, 3 breakout rooms (each 35m2), 58 rooms, 3 suites / Opening: 17 December 2011

Ticino

Water Park Splash & Spa, RiveraInfrastructure: 10'000 m2 complex under 3 cupolas, 700 metre long water slides, wellness area, restaurants and bars / Opening: winter 2012/2013
Boutique-Hotel Giardino Lago, MinusioInfrastructure: 14 rooms & 1 suite / Opening: december 2011
Lounge at the Lido LocarnoDescription: elegant lounge bar, 400m2, ideal for all kind of events / Opening: in summer 2011

Valais

Cordée des Alpes, VerbierInfrastructure: 34 rooms and suites and 14 apartments in the "Alpine Chic" style; exclusive spa / Opening: december 2012

"Alpes et caetera" Bed & Breakfast, VercorinInfrastructure: 8 authentic and themed huts, 9 double rooms, 1 meeting room for 30 persons / Opening: december 2012

Hôtel des Bains****, SaillonInfrastructure: 150 rooms; 3 meetings rooms / Investment: CHF 2 Mio / Opening: 2012

Zürich

Güterbahnhof Zürich - Freight Railway Station ZürichDescription: the former freight railway station, under monumental protection, is rebuilt and will be opened as an event location / Infrastructure: event area of 4500m2, usage very flexible; catering Partner: Hiltl, a vegetarian restaurant chain / Opening: 19 january 2012

B2 Boutique Hotel + Spa****Infrastructure: 51 rooms and 9 suites, 2 meeting rooms for 12 and 18 persons / Investment: CHF 24 Mio / Opening: march 2012

Environmental arena (Umwelt Arena), SpreitenbachDescription: interactive museum with permanent exhibition around sustainability; whole building built sustainable, incl. catering, heating and cooling with groundwater, photovoltaic system on the roof, LD technic for projectors etc; exhibition in German, French and English; a race course in the middle of the building can be set up, to test environmentally friendly vehicles, f.ex. for incentives /
Infrastructure: total event space: 3500m2, with several seminar rooms / Opening: autumn 2012

25hours Hotel****, Hard Turm Park Zürich WestInfrastructure: 126 rooms, conference rooms / Opening: 2012

Stilhaus, RothristInfrastructure: 20'000m2 exposition area, 2 conference rooms with a total capacity of 100 persons / Opening: autumn 2012

Folium, ZürichDescription: location in Sihlcity, in the old paper mill; industrial caracter; several setups possible; ideal complement to the Papiersaal / Opening: 2012

Grand Casino ZürichDescription: extensive entertainment offer with stage, restaurants, bars, clubs and lounges; additional suface for entertainment: 6000m2. / Investment: CHF 70 Mio / Opening: end of 2012
Renaissance Zürich Tower Hotel*****Description: in the Mobimo Tower / Infrastructure: 300 rooms, 7 conference and ball rooms with a total surface of 1000m2 and a capacity for up to 700 persons / Opening: august 2011

Ramada-Hotel Zürich City****Infrastructure: 159 rooms, 3 conference rooms with natural daylight and a capacity for up to 80 persons / Opening: february 2011
Clouds Conference and Private Dining, Prime Tower, Zürich-WestDescription: the Prime Tower will be the highest building in Zürich / Infrastructure: 7 new conference rooms, the biggest with a capacity of up to 100 delegates / Opening: december 2011
Ramada Feusisberg-Einsiedeln*** supInfrastructure: 72 rooms and 10 suites / Opening: january 2010

Expansions and reopenings

Basel

Markthalle BaselDescription: complex with shops, restaurants, event space, offices and apartments. Event space of more than 1000m2, for all kinds of events / Opening: 24 march 2012.
Courtyard by Marriott****Infrastructure: 174 rooms / Opening: march 2010

Teufelhof Basel 33 rooms, new conference room "Shine"
Basel Exhibition CentreDescription: new Auditorium / Infrastructure: capacity boosted from 450 to 525 seats / Opening: august 2010

Bern

Sorell Hotel Ador Bern****Description: three new meeting rooms / Infrastructure: total of 17 flexible seminar rooms with a capacity of up to 350 people; 57 newly renovated hotel rooms / Opening: 2012

Hotel Allegro Bern****S / Kursaal BernDescription: recent years have seen extensive upgrading of the Hotel Allegro and meeting facilities; in 2012 the opening of a new Congress Centre transformed the Kursaal Bern into one of the top Swiss venues for international events of excellence /
Infrastructure: 171 rooms and suites / Investment: CHF 35 Mio / Opening: 2012 BEA Bern CongressDescription: project "NAHA 2+"; improvement of congress area / Infrastructure: new foyer, entry zone with direct access to congress centre; event hall (10'000 m2) / Investment: CHF 45 Mio / Opening: 15. April 2011
Hotel Schweizerhof*****Description: complete renovation / Infrastructure: 100 rooms, 800 m2 conference and business center, unique ball room / Opening: april 2011; wellness oasis in the end of 2011

Hotel Bellevue Palace*****, BernDescription: renovation of kitchen and technical and climatic installations / Infrastructure: 130 rooms / Investment: CHF 13 Mio / Opening: summer 2010

Davos

Hotel National****Description: complete refurbishment of the 60 rooms; installation of a small but well equipped sauna; renovation of the kitchen and extension of the existing ski-storage with direct access from indoors / Opening: rooms in spring 2011, sauna in december 2011
Kongresszentrum DavosDescription: congress hall with a new capacity of 2000 people, 6 additional meeting rooms / Opening: december 2010

Engadin St. Moritz

Romantik Hotel und Restaurant Muottas MuraglDescription: complete renovation; first "Plus Energy Hotel" in the Alps / Infrastructure: 16 rooms, 3 restaurants, terrace; seminar capacity from 10-200 delegates / Opening: winter 2010/2011

Flims Laax Falera

Waldhaus Flims Mountain Resort & Spa*****Description: new opened Boardroom "The Mountain Suites", equipped video conference room for up to 12 persons / Opening: 2012

Geneva

Le Richemond Geneva*****Description: new member of the Dorchester Collection; renovation of the restaurant, the bar and the suites / Infrastructure: 109 rooms / Opening: the hotel will remain open during the renovation works

Hotel N'vY****s (formerly Epsom)Description: Arty.Cosy.Trendy. Where technology is designed to facilitate daily life invites to a boho-chic inspired lifestyle. Hotel N'vY offers a new concept, where necessity makes way for desire; conference and banquet facilities with daylight. / Infrastructure: 153 rooms / Opening: december 2012

Four Seasons Hôtel des Bergues*****Description: renovation of 21 rooms plus 18 new rooms, among them 3 presidential suites / Infrastructure: total capacity: 115 rooms
Hotel Intercontinental Genf*****Description: renovation of the lobby, restaurant and of the 340 rooms; ecological aspect: 30% less heating costs and 40% less energy use / Investment: CHF 100 Mio / Opening: 2010

Gstaad

Grand Hotel Park*****Description: complete renovation / Infrastructure: 94 rooms including the new created Penthouse Suites / Opening: 17 december 2010

Interlakenand Thun

Congress Hotel Seepark****Description: renovation of the 85 rooms, 4 junior suites, and of the conference room "Geneva" with a capacity of 370 participants / Opening: 1st march 2012
Hotel Eden****, SpiezDescription: extension with 10 seminar rooms with a total capacity of 165 delegates / Infrastructure: 43 rooms / Opening: march 2010
Kongresszentrum Casino KursaalDescription: additional rooms with capacity for up to 1200 people / Opening: may 2010

Lausanne

Hôtel Agora Swiss-Night****Description: complete renovation of the 82 rooms; 2 conference rooms / Re-opening: summer 2012

Mövenpick Hotel LausanneDescription: third biggest 4-star hotel in Switzerland; new Minergie complex (green roof) with 72 additional rooms and 3 seminar rooms; renovation of 12 meeting rooms / Infrastructure: total 337 rooms, total capacity meeting rooms: 300 persons / Opening: end 2011

Lugano

Hotel & Spa Kurhaus Cademario****+, CademarioDescription: complete renovation / Infrastructure: 82 rooms including 12 suites / Reopening: october 2012

Luzern and Lake Lucerne Region

Ibis Styles Luzern City Hotel Description: former Hotel NH Luzern, will be run by Accor, Budget Hotel with design interiors / Infrastructure: 109 rooms, 1 restaurant, several conference rooms / Opening: january 2012

Seminar- and Wellnesshotel Stoos****Description: new Smoker's Lounge, bigger lobby, renovated single rooms, maisonette rooms and apartments / Opening: beginning 2012

Seehotel HermitageDescription: generous new classic rooms / Opening: 2012

Hotel SeeburgDescription: renovated standard rooms, top modern conference rooms / Opening: march 2012

Hotel AstoriaDescription: new conference room (100m2) / Opening: march 2012

Park Hotel VitznauDescription: complete renovation; luxury suites hotel / Investment: CHF 200 Mio / Re-opening: september 2012

Hotel VitznauerhofDescription: complete renovation / Infrastructure: 53 rooms; seminar capacity for 35 people / Opening: spring 2010

Hotel Continental Park****Infrastructure: 17 newly renovated rooms; total rooms: 92 / Opening: summer 2010

Hotel Waldstätterhof***Description: 20 new rooms and business suites; 1 new banquet and seminar room for 40 persons / Infrastructure: total of 5 seminar rooms / Opening: summer 2010

Hotel AstoriaInfrastructure: 50 renovated rooms, total 250 rooms, 2 updated seminar rooms, total 12 / Opening: summer 2010

Hotel Schweizerhof*****Description: new wellness and beauty area; total 101 hotelrooms / Opening: summer 2010

Pilatus Kulm Hotel****Description: in the hotels Kulm and Bellevue, including conjunction tunnel between the hotels / Investment: CHF 14.2 Mio / Opening: august 2010

Montreux

Montreux Music & Convention CentreDescription: technical modernization of the technical equipment of the 2m2c on the occasion of its 40 anniversary; work started in december 2012 / Investment: CHF 7.7 Mio

Hôtel Suisse Majestic****Description: complete renovation / Infrastructure: 156 refurbished rooms (19 totally new) / Investment: CHF 20 Mio / Opening: may 2010

Montreux Music & Convention Centre (2m2c)Description: investment plan over seven years aiming to modernice the 2m2c's infrastructrue; adjustment of the auditorium Stravinski's scenic and acoustic installations / Investment: auditorium Stravinski CHF 7.75 Mio; total investment CHF 19 Mio

St.Gallen - Bodensee

Radisson Blu Hotel****Infrastructure: 123 rooms; new meeting floor: 8 meeting rooms in the 400m2 meeting centre / Opening: september 2012

Hotel Säntispark****Description: 60 new rooms; upgrading of gastronomical and seminar areas; start of renovation: 2012 / Infrastructure: total number of rooms: 130 / Investment: CHF 30 Mio

Ticino

Hotel Belvedere, LocarnoDescription: 5 seminar rooms (120 persons), new entrance hall, banquett and meeting facilities for up to 400 persons, 81 hotelrooms / Opening: march 2012

Albergo Caffè Carcani***, AsconaDescription: total renovation; member of the Tschuggen Hotel Group / Infrastructure: 29 rooms / Opening: april 2012

Hotel Internazionale***, BellinzonaDescription: new meeting rooms with most modern tecnique / Infrastructure: 60 rooms and 3 suites / Opening: autumn 2012

Hotel Eden Roc*****, AsconaDescription: new wellness area, 16 additional rooms and a third restaurant / Opening: april 2010

Valais

Mont Cervin Palace*****, ZermattDescription: renovation of the rooms and suites (8 months) / Investment: CHF 12 Mio / Opening: winter 2012

Zürich

Park Inn at Zürich AirportDescription: renovation of the 210 rooms / Opening: may 2012

Seedamm Plaza****, PfäffikonDescription: office and training centre; 40 additional hotel rooms; planned start of construction is mid 2012 / Investment: CHF 70 Mio

Radisson Blu Hotel Zürich AirportDescription: opened an additional 512m² meeting space on the 8th floor / Infrastructure: total of 52 meeting rooms, all with natural daylight and view of the airport or the Swiss mountains / Opening: october 2012

Zürich Marriott HotelDescription: redesigned business suite and renovation of the 74 rooms in the north wing; new meeting room "Index" with 90m2 / Infrastructure: total of 255 rooms / Opening: march 2010

Hotel Baur au Lac*****, ZürichDescription: complete renovation / Infrastructure: 120 rooms, including 27 junior suites and 18 suites / Investment: CHF 160 Mio

Swissotel Zürich*****, ZürichDescription: total renovation of the 347 rooms / Infrastructure: 19 conference rooms for up to 1000 persons / Investment: CHF 2.2 Mio

Select a different view for your results:

Add