Intro

The Infopoint Sigirino is the starting point for guided tours inside the Ceneri Base Tunnel. After commissioning of the Gotthard Base Tunnel, the 15.4-kilometers-long Ceneri Base Tunnel is Switzerland's largest tunnel-construction project.

Guided tours of the construction site at Sigirino are only available to groups with prior reservation.

The following visits are offered at Sigirino:

Guided tour of the Ceneri Base Tunnel
Duration approx. 3 hours

Guided tour of the Sigirino surface construction site of the Ceneri Base Tunnel
Duration approx. 2 hours (also suitable for children)

Lecture on the NEAT project inside the Infopoint Sigirino
Duration approx. 45 minutes (wheelchair accessible)

Opening hours:
January – December
Tuesday to Saturday 09:30 - 14:00

All visits are offered in Italian, German, French, English and Spanish.

Основная информация

Show Подробнее content
Сезон
круглый год
Продолжительность
2 to 4 hours (half day)
Подходит для
Groups

Цены и информация для групп

Show Подробнее content
Язык
немецкий, английский, итальянский, французский
Человек в группе
10 - 50
Цена от
CHF 10

Откройте для себя окрестности

Overview

Подсказка

Обзорная
Sigirino
Тичино
Показать на карте

туристическая информация: Sigirino